The objective of installing this system was to lower the production cost of cement by replacing the high cost natural gypsum with the lower cost synthetic [Flue Gas Desulfurization (FGD)] gypsum.
The plant operates two cement mill systems. The system installed includes two dump hoppers each equipped with two drag flight feeders. Gypsum from each dump hopper is metered onto a collecting belt conveyor equipped with a weigh idler. The collecting belt conveyor discharges onto a belt conveyor that discharges the gypsum into the cement mill inlet chute.